Demolition of a 62-year-old bridge span is underway. Traffic will be affected as vehicles are redirected to a single bridge. Drivers can expect one lane open in each direction.

Ramp closures are also part of the plan, with two specific ramps shut down. These closures are expected to remain in place for a while. Further details about the traffic shift and demolition are available, including information about the impact on commuters and the construction timeline.